What should be avoided when installing the valve?

Time:2020-10-30
Valve is the most common equipment in chemical enterprises. It seems easy to install the valve, but if it is not executed according to the relevant technology, safety accidents will occur

Valves are the most common equipment in chemical enterprises. It seems easy to install valves, but if they are not executed in accordance with relevant technologies, safety accidents will occur...

No-no 1

Hydrostatic test was carried out under negative temperature in winter.
Consequence: the tube freezes quickly during the hydrostatic test, causing the tube to freeze.
Measures: water pressure test should be carried out as far as possible before winter application, and the water should be blown clean after pressure test, especially the water in the valve must be cleared in the clean, otherwise the valve will be light rust, heavy freeze crack.
During the hydrostatic test in winter, the project must be carried out at a positive indoor temperature and the water must be blown clean after the pressure test.

No-no 2

The pipeline system is not flushed carefully before completion, and the flow rate and speed cannot meet the requirements of pipeline flushing.
Water pressure strength test was even used instead of flushing.
Consequences: The water quality does not meet the operation requirements of the pipeline system, which often leads to the reduction or blockage of the pipeline cross section.
Measure: Flush with the maximum flow rate or flow rate not less than 3m/s.The water color and transparency of the discharge outlet should be consistent with the visual measurement of the water color and transparency of the inlet.


No-no 3

Sewage, rainwater and condensate pipes shall be concealed without water closing test.
Consequences: may cause water leakage, and cause user losses.
Measures: The closed water test should be checked and accepted strictly according to the standard.Underground installation, ceiling, pipe and other hidden sewage, rainwater, condensate pipe to ensure that no leakage.

No-no 4

In the water pressure strength test and tightness test of pipeline system, only observe the change of pressure value and water level, and the inspection of leakage is not enough.
Consequences: Leakage occurs after the operation of the pipeline system, which affects the normal use.
Measures: When the piping system is tested in accordance with the design requirements and construction specifications, the pressure value or water level changes shall be recorded within the specified time, and in particular, the leakage shall be carefully checked.

No-no 5

Butterfly valve flanges use ordinary valve flanges.
Consequence: butterfly valve flange and the general valve flange size is not the same, some flange diameter is small, and butterfly valve disc is large, resulting in not open or hard to open the valve damage.
Measures: according to the actual size of the butterfly valve flange flange processing flange.

No-no 6

In the construction of the building structure, there are no reserved holes and embedded parts, or the reserved holes are too small in size and the embedded parts are not marked.
Consequence: in the construction of warm sanitation project, picking out the building structure, or even cutting off the reinforced bar, affecting the safety performance of the building.
Measures: Be familiar with the construction drawings of heating and sanitation project, and actively and seriously cooperate with the construction of reserved holes and embedded parts according to the installation requirements of pipes, supports and hangers, and refer to the design requirements and construction specifications for details.

No-no 7

During pipeline welding, the wrong opening of the pipe after the opposite port is not in a center line, no clearance is left for the opposite port, no groove is removed for the thick-wall pipe, and the width and height of the welding seam do not meet the requirements of the construction code.
Consequence: the wrong orifice of the pipe is not in a center line, which directly affects the welding quality and perception quality.No clearance is left for the counterpart, no slotting is done for the thick-walled pipe, and the welding strength cannot be reached if the width and height of the welding seam do not meet the requirements.
Measures: After welding the pipe to the other side, the pipe should be on the center line instead of the other side.A gap should be left at the opposite mouth;Thick - walled pipes should be slotted.In addition, the width and height of the weld shall be welded in accordance with the requirements of the code.

No-no 8

Pipelines are directly buried in frozen soil and untreated loose soil, and the piers are not properly spaced and located, or even in the form of dry code bricks.
Consequence: The pipe was damaged in the process of compaction of backfill earth due to unstable support, which caused rework and repair.
Measures: The pipe shall not be buried in frozen soil and loose soil without treatment. The distance between piers shall meet the requirements of construction code, and the supporting pad shall be firm. In particular, the pipe connection shall not bear shear force.Brick piers to use cement mortar masonry, ensure integrity, firm.

No-no 9

The material of the expansion bolts for fixing the pipe bracket is inferior, the aperture of the installation expansion bolts is too large or the expansion bolts are installed on the brick wall or even the light wall.
Consequences: Loose pipe support, pipe deformation, and even fall off.
Measures: qualified products must be selected for expansion bolts. If necessary, samples should be taken for test inspection. The diameter of expansion bolts installed should not be 2mm larger than the outside diameter of expansion bolts.

No-no 10

Flanges and gaskets for pipe connections are not strong enough, and the connecting bolts are short or thin in diameter.Rubber pads are used for heat pipes, double or bevel pads for cold water pipes, and flange gaskets protruding into the pipes.
Consequence: flange connection is not tight, even damaged, leakage phenomenon.The penetration of the flange gasket into the tube will increase the flow resistance.
Measures: flanges and gaskets used in pipelines must meet the requirements of working pressure in pipeline design.
Rubber asbestos gaskets should be used for flange gaskets of heating and hot water supply pipes;Rubber gasket should be used for flange gasket of water supply and drainage pipeline.
The gasket of the flange shall not protrude into the tube, and the outer circle to the flange bolt hole shall be appropriate.Bevel pads or several gaskets shall not be placed in the middle of the flange. The diameter of the bolt connecting the flange should be less than 2mm than the diameter of the flange flange. The length of the bolt protruding nut should be 1/2 of the thickness of the nut.

No-no 11

Incorrect valve installation method.
For example, the water (steam) flow of globe valves or check valves is opposite to the sign, the stem is installed downward, horizontal check valves are installed vertically, the handle of rising stem gate valve or butterfly valve has no open and closed space, the stem of hidden valve is not oriented toward the inspection door.Consequences: valve failure, switch maintenance difficulties, valve stem down often cause water leakage.
Measures: Install in strict accordance with the valve installation instructions, keep the stem of the rising gate valve open height, fully consider the rotation space of the butterfly valve handle, all kinds of valve stem should not be lower than the horizontal position, let alone down.The hidden valve should not only set the inspection door to meet the needs of opening and closing the valve, but also the stem should face the inspection door.

No-no 12

The installation valve specifications and models do not meet the design requirements.
For example, the nominal valve pressure is less than the system test pressure;When the diameter of water supply branch pipe is less than or equal to 50mm, use gate valve;Cut-off valves are used in the dry and riser pipes for hot water heating.Butterfly valve is used for water suction pipe of fire pump.
Consequences: Affect the valve normal open and close and adjust resistance, pressure and other functions.Even caused damage to the valve during the operation of the system and forced repair.
Measures: Familiar with the application range of all kinds of valves, according to the design requirements to choose the valve specifications and models.Nominal valve pressure to meet the requirements of system test pressure.According to the requirements of the construction code: cut-off valve shall be used for the water supply branch pipe diameter less than or equal to 50mm;Gate valves should be used when pipe diameter is greater than 50mm.Hot water heating dry, vertical control valve should be used gate valve, fire water pump suction pipe should not be used butterfly valve.

No-no 13

The valve does not perform necessary quality inspection before installation.
Consequences: In the operation of the system, the valve switch is not flexible, the shutdown is not strict and the phenomenon of leakage (steam) occurs, causing rework and repair, and even affecting the normal water supply (steam).
Measure: Before installation, the valve should be tested for compressive strength and tightness.The quantity of each batch (same brand, same specification, same model) shall be randomly checked by 10% and not less than one.The strength and tightness test should be done one by one for the closed - circuit valve installed on the main pipe.The strength and tightness test pressure of the valve should comply with the "Construction Quality Acceptance Code for Building Water Supply, Drainage and Heating Engineering" (GB 50242-2002).

No-no 14

The main materials, equipment and products used in the construction are in lack of technical and quality appraisal documents or product certificates conforming to the current national or ministry standards.
Consequences: the project quality is not qualified, there are potential accidents, can not be delivered to use on schedule, must be reworked and repaired;Delay of construction, increase of manpower and material input.
Measures: The main materials, equipment and products used in water supply and drainage and heating and sanitation engineering shall meet the technical and quality identification documents or product qualification certificates issued by the state or the Ministry;The product name, model, specification, national quality standard code, date of manufacture, name and place of manufacturer, inspection certificate or code of the ex-factory product shall be indicated.

No-no 15

The valve inversion
Consequences: Check valve, throttle valve, pressure reducing valve, check valve and other valves have directionality, if installed in reverse, throttle valve will affect the service effect and life;Pressure relief valves do not work and check valves can be dangerous.
Measures: General valves, direction marks on the body;In case of no, the valve should be correctly identified according to the working principle.The valve chamber of the globe valve is asymmetrical, the fluid should be let from the bottom to the top through the valve mouth, so that the fluid resistance is small (determined by the shape), open to save effort (due to the medium pressure up), closed after the medium does not pressure packing, easy to repair.This is why the globe valve cannot be reversed.
Gate valves should not be inverted (i.e., handwheel down), as this can cause media to remain in the cover space for a long time, corrode the stem, and is No- No to certain process requirements.It is inconvenient to change packing at the same time.
Open stem gate valves should not be installed underground or the exposed stem may corrode due to moisture.
Lifting type check valve, when the installation to ensure that its disc vertical, in order to lift flexible.
Swing check valve, install to ensure its pin shaft level, so that the swing flexible.
Pressure relief valves should be installed upright in a horizontal pipe line, do not tilt in all directions.

No-no 16

Manual valve opening and closing, too much force
Consequences: light valve damage, serious safety accidents
Measure: The manual valve, its handwheel or handle, is designed according to ordinary manpower, taking into account the strength of the sealing surface and the necessary closing force.So you can't use a long lever or a long plank to move the plank.Some people are used to using the board hand, should be strict attention, do not exert too much force, otherwise easy to damage the sealing surface, or plate broken handwheel, handle.Open and close the valve, the force should be smooth, not impact.Some impact open and close high pressure valve components have been considered the impact and the general valve can not wait.For the steam valve, before opening, should be pre-heated, and exclude condensate, open, should be as slow as possible, so as not to occur water hammer phenomenon.When the valve is fully open, the handwheel should be reversed a little, so as to tighten between threads, so as not to loosen and damage.For open stem valves, remember stem positions when fully open and fully closed to avoid hitting the upper dead center when fully open.It is convenient to check whether it is normal when closed.If the valve does fall off, or between the valve core seal embedded larger debris, when the valve stem position is about to change.When the pipeline is first used, there are a lot of internal dirt, the valve can be slightly opened, using the high-speed flow of the medium, wash it away, and then gently closed (can not close quickly, violently closed, in case of residual impurities caught in the sealing cover), open again, so repeated many times, clean the dirt, then put into the normal work.Often open the valve, sealing surface may be sticky with dirt, when closed, also want to use the above method to flush clean, and then formally close.If the handwheel or handle is damaged or lost, it should be fitted immediately, and can not be replaced by the movable plate hand, so as to avoid damage to the valve stem square, not open and close properly, so as to cause accidents in production.Some media, cooled after the valve closed, so that the valve parts shrink, the operator should be closed at the appropriate time again, so that the sealing surface without fine seam, otherwise, the medium from the fine seam high-speed flow, it is easy to erosion sealing surface.During the operation, if the operation is found to be too strenuous, the reason should be analyzed.If packing is too tight, loosen appropriately. If stem is askew, advise repair.Some valves, in the closed state, the closure of the thermal expansion, causing difficulty in opening;If it must be opened at this time, unscrew the bonnet half to one turn to eliminate stem stress and then turn the plate.

No-no 17

Improper installation of valve in high temperature environment
Consequences: Causing a spill
Measures: The high-temperature valve above 200℃ is at room temperature when installed, but after normal use, the temperature rises, the bolt expands in heat, the gap increases, so it must be tightened again, called "hot tight", the operator should pay attention to this work, otherwise it is easy to leak.

No-no 18

Cold weather does not drain in time
Measures: when the weather is cold, the water valve should be closed for a long time, the water should be removed after the valve.After the steam valve stops steam, condensate should also be removed.The bottom of the valve is like a silk plug, it can be opened to drain.

No-no 19

Nonmetal valve with too much opening and closing force
Measure: nonmetal valve, some hard and brittle, some low strength, operation, open and close force can not be too big, especially can not make strong.Also be careful not to bump objects.

No-no 20

The new valve packing is too tight
Measures: when the new valve is used, the packing should not be pressed too tight, with no leakage as a degree, so as not to pressure the valve stem is too big, speed up the wear and tear, and open and close laboriously.The quality of valve installation directly affects use, so careful attention must be paid to valve direction and position, valve construction, valve protection, bypasses and instrumentation, and valve packing replacement.

No-no 21

The installation position has no operating space
Measures: the valve installation position must be convenient for operation;Even if the installation is temporarily difficult, the operator's long-term work should be considered.Best valve handwheel and chest even (generally 1.2 meters away from the operation floor), so, open and close the valve more energy saving.Landing valve hand wheel should be up, do not tilt, so as not to operate awkwardly.The wall machine depends on the valve of the equipment, also want to leave room for the operator to stand.To avoid relying on the sky operation, especially acid and alkali, toxic medium, otherwise very unsafe.

No-no 22

Hit a valve made of brittle material
Measures: installation and construction must be careful, do not hit the valve made of brittle materials.Before installation, check the valve to see if there is any damage, especially to the stem.Also turn a few times to see if the valve is skewed, because during transportation, the most prone to skew valve stem.Also remove debris from the valve.When the valve is hoisted, the rope should not be tied to the handwheel or stem to avoid damaging these parts. It should be tied to the flange.Be sure to clean the line to which the valve is attached.Iron oxide chips, sand, welding slag and other sundries can be blown by compressed air.These sundries, not only easy to scratch the sealing surface of the valve, including large particles sundries (such as welding slag), but also can block the small valve, make its failure.When installing the screw valve, the sealing filler (wire and lead oil or polytetrafluoroethylene raw material belt) should be wrapped on the pipe thread, do not get into the valve, in order to avoid the memory of the valve, affect the medium flow.When installing flanged valves, pay attention to tighten bolts symmetrically and evenly.Valve flange and pipe flange must be parallel, reasonable clearance, to avoid valve too much pressure, or even cracking.Particular attention should be paid to brittle materials and low strength valves.The valve to be welded with the pipe should be spot-welded first, then fully open the closed parts, and then welded dead.

No-no 23

The valve is not insulated and cooled
Action: Some valves also require external protection, which is insulation and cooling.Steam lines are sometimes added to heat insulation.
What kind of valves should be insulated or cooled depends on production requirements.In principle, where the valve medium to reduce the temperature is too much, will affect the production efficiency or freeze damaged valve, the need for insulation, or even heat;Where the valve bare, adverse to production or cause frost and other adverse phenomena, the need to keep cold.Insulation materials include asbestos, slag wool, glass wool, perlite, diatomite, vermiculite, etc.Keep cold material to have cork, perlite, foam, plastic.

No-no 24

Bypass not installed on trap
Measures: Some valves, in addition to the necessary protection facilities, also have bypasses and instrumentation.Bypass is installed to facilitate maintenance of the trap.Other valves may also be bypassed.Bypass installation depends on valve condition, importance, and production requirements.

No-no 25

Packing not replaced regularly
Measures: inventory valve, some packing is not good, and some with the use of media, it is necessary to replace the packing.
The valve faces thousands of different media, packing box is always filled with ordinary packing, but when used, must let the packing and the medium to adapt.
When changing packing, press in round by round.The seams of each ring shall be 45 degrees, and the joints of the rings and rings shall be staggered 180 degrees.The height of the packing shall allow for further compaction of the gland and, at the present time, the proper depth of the packing chamber at the lower gland, normally 10-20% of the total depth of the packing chamber.
For high demand valves, seam Angle is 30 degrees.The seam between the loops is staggered by 120 degrees.
In addition to the packing, can also according to the specific situation, USES the rubber o-ring (natural rubber resistant to 60 degrees Celsius under weak base, butyl eyes below 80 degrees Celsius oil resistant rubber, fluorine rubber resistance to a variety of corrosive medium under 150 degrees Celsius) three fold type teflon ring (below 200 degrees Celsius) strong corrosive medium resistance of nylon bowl ring (below 120 degrees Celsius, ammonia alkali resistant) forming filler.A layer of polytetrafluoroethylene raw material belt outside the common asbestos packing can improve the sealing effect and reduce the electrochemical corrosion of the valve stem.
When pressing the packing, turn the stem simultaneously to keep all sides even and prevent too much dead, tighten the gland evenly without tilting.


主站蜘蛛池模板: 国产精品18久久久_一本一道久久a久久精品_国产精品久久久久久高潮_九九在线国产视频_blacked蜜桃精品一区_亚洲最新av网站_免费av手机在线观看片_成人亚洲视频在线观看 | 91嫩草国产线免费观看_欧美日产亚洲国产精品_国产视频午夜_成人永久免费网站在线观看_逼逼操操_国产精品国产精品不卡_国产98色在线_亚洲精品一区国产精品 男人j桶进女人p无遮挡免费的视频_亚洲kkk4444在线观看_极品少妇被啪到呻吟喷水_国产精品臀控福利在线观看_97视频国产自在自线2020_视频h在线_国产成人午夜福利r在线观看观看_午夜福利啪啪片 | 亚洲精品A片久久久久_三级网站午夜三级_男女性爽大片在线观看_日本高清视频一区二区三区_亚洲精品色综合av网站_www.av日韩_免费视频啪视频在线观看老司机a_午夜性做爰免费看 | 久久一区二区三区av_欧美精品激情在线_精品亚洲在线_四虎在线网址_中文字幕一区二区三区免费视频_色片在线免费观看_欧美日韩超碰_国产一线毛片 | 亚洲欧美中日韩_毛茸茸bbwbbwbbwbbwxxxx_www.成人.com_国产凹凸在线一区二区_久爱视频在线_999热这里只有精品_东京无码熟妇人妻AV在线网址_四川少妇bbbb | 亚洲国产熟妇无码日韩_国产亚洲欧美日韩国产片_女人天天干夜夜爽视频_日韩在线观看视频一区二区三区_中国XVIDEOS厕所偷窥_狠狠色狠狠色综合日日不卡_在线观看免费亚洲_国产又色又爽又黄的网站在线 | 丰满人妻熟妇乱又仑精品_色精品一区二区三区_91精品午夜窝窝看片_sss海量视频在线观看_亚洲高清视频免费观看_中文字幕亚洲欧美专区_草草影院第一页yyccc_亚洲国产七七久久桃花 | 久青草视频_欧美日韩国产精品自在自线_国产自偷亚洲精品页65页_无码免费大香伊蕉在人线国产_97caopor国产在线视频_久久精品欧美一区二区三区麻豆_亚洲第一页国产_女人色网站 | 黄色特级视频_国产天堂久久_欧美の无码国产の无码影院_亚洲精欧美一区二区精品_美乳在线播放_久久精品日产第一区二区三区的功能_免费在线看成人av_高清一区二区视频 | 亚洲二区不卡_一本大道久久东京热无码av_青青草草视频_av色综合网_毛片一区二区三区无码_亚洲中文字慕日产2021_亚洲精品国产精品乱码不99按摩_亚洲成Av人片在线观看不卡 | 福利免费在线_中文字幕无码日韩专区免费_亚洲成人一区二区三区四区_久久99精品久久久97夜夜嗨_内射高潮享受视频在线观看_中文字幕av无码专区第一页_一区二区三区在线观看免费视频_新疆老熟女厉害 | 超碰在线久_中文字幕けのぁ一般男女_91福利在线观看_7777日本精品一区二区三区_四虎永久地址www成人_在线天堂中文在线资源网_成人午夜天堂_旧里番高h无码无修在线观看 国产乱子伦精品免费女_AV人摸人人人澡人人超碰妓女_亚洲高清中文字幕免费_我爱我爱色成人网_亚洲一区不卡在线_夜夜未满十八勿进的爽爽影院_J97久久国产亚洲精品超碰热_日本高清久久久 | 精品久久久久久久久久中出_成人免费在线网址_正在播放重口老熟女露脸_精品国产成人av_欧美在线亚洲_激情毛片无码专区_亚洲超高清大胆极品人体美女_欧美日韩高清 男人的天堂Aⅴ在线_特级毛片A片全部免费97_97免费看_免费无码一区二区三区A片百度_精品成人网_狠狠噜天天噜日日噜视频跳一跳_中国熟妇人妻videos_日日碰日日摸夜夜爽无码 | 国产午夜精品一区理论片_av在线免费播放_久久亚洲日韩看片无码_婷婷九月激情_成年人在线视频观看_精品亚洲精品_中国黄色a级_太九tai9免费网站 | av2018天堂网_黄漫网站在线观看_国产高清一_青青草娱乐视频_aaaa大片_最新日韩精品视频_91视频黄色_一区二区三区三州 | 红杏国产成人精品视频_欧美超碰在线观看_免费日韩一区_国产一二三精品无码不卡日本_www.亚洲精品.com_国产精品久久久久久久岛一牛影视_国产精品人妻一区夜夜爱_人人人人爱 | 国产九九免费_91精品久久久久久久久入口_久久国产精品成人免费_国产美熟女乱又伦av果冻传媒_精品国产精品三级精品av网址_中国娇小与黑人巨大交_中国毛片一级片_鲁一鲁AV2019在线 | 午夜男女爽爽影院免费视频_国产成一区二区_日韩视频第一区_亚洲韩日精品_26uuu久久综合_亚洲综合国产一区二区三区_免费中文字幕日韩_九九热免费在线 | 欧美性生活18~19_深夜免费看_操鸡视频在线观看_国产亚洲日本精品成人专区_国产一区二区免费在线观看视频_国产毛片一区二区三区_在线欧美_美女裸体视频免费网站无毒不卡 | 精品人妻无码一区二区三区手机版_欧美日韩成人精品久久二区_免费成人av网址_免费看片www8x5xcom_内射欧美老妇WBB_掀开奶罩边躁狠狠躁苏玥视频_免费成人高清在线视频_毛片官网 | 日韩在线综合视频_亚洲精品成人18久久久久_国产原创AV在线播放不卡_免费看国产黄色_亚洲免费精品视频_国产亚洲精品久久久999功能介绍_日韩美国1级大片_老太婆性杂交毛片 | 久久久久久精品无码人妻_亚洲欧洲日韩精品中文字幕_国产乱一乱二乱三_在线观看国产成人无码_精品人在线二区三区_性爱国产精品福利_少妇自慰流白口浆21p_神马午夜精品 | 一本大道久久a久久综合婷婷_国产aⅴ无码专区亚洲av麻豆_精品第一国产综合精品蜜芽_亚洲人视频_九九热视频免费_成人福利av_一级免费观看_亚洲不卡一区二区三区四区 | 精品国产一区二区三区四区五区_午夜激情三级_在线免费看污_亚洲黄色av片_色777狠狠狠综合_成人一区二区三区视频在线观看_欧美精品性生活_久久精品12 | 欧美精品一区二区视频_97超碰人人爱香蕉精品_成年人在线免费_黄瓜视频在线免费欧美日韩在线看_成人av大全_国产精品免费看_国产精品偷伦视频播放_国产欧美日韩亚洲一区二区三区 | 欧美日韩在线视频播放_成人国产1314www色视频_粗大猛烈进出白浆视频_懂色av一区二区三区免费观看_亚洲看片_免费人成自慰网站_天堂网在线观看视频_亚洲激情视频在线观看 | 日韩国产高清在线_亚洲成人日本_亚洲综合播放_色九九影院_在线一级成人_亚洲午夜精品视频_欧美a级在线观看_亚洲自偷自偷偷色无码中文 | 伊人久久中文字幕_性视频毛片_精品91久久久久_四色网站_美女久久99_国产视频在线免费观看_日本特级一级片_无码真人肉片在线观看 | 91夫妻在线_精品欧洲AV无码一区二区男男_国产亚洲精品久久网站_日本成人在线播放_精品视频二区_欧美日在线播放_亚洲一区激情_成年人黄页 | 亚洲AV成人精品日韩在线播放_97夜夜澡人人爽人人模人人喊_国产成人精品免费视频大全五级_日韩区欧美久久久无人区_中文天堂网www新版资源在线_欧美饥渴熟妇高潮喷水_www.青青草原.com_日韩专区一区二区 | 一区动漫_国产91在线高潮白浆在线观看_72成人网_国产一女三男实拍视频_欧美最猛性xxxx_aaaaa一级片_国产高清一国产aV麻豆网_黄频网址 | 国产日韩在线一区_色婷婷激情一区二区三区_狠狠做五月深爱婷婷伊人_成人二区_国产又黄又大又粗视频_亚洲性免费视频_日韩三级精品_91经典在线 | 91专区在线观看_yellow中文字幕国产资源_国产嫩草影院久久久久_激情天堂网_久草网站在线观看_强奷表妺好紧2_免费观看又黄又爽的视频_免费在线国产视频 | 日本黄色一级_国产精品三p一区二区_国产成人片《羞羞》上映_欧美日日日日bbbbb视频_日本视频在线观看一区二区_开心亚洲五月丁香五月_免费国产视频在线观看_中文字幕视频在线播放 | 中文字幕日日_无码国产精品一区二区免费式芒果_免费日韩精品_caoporn免费在线视频_最近2019中文免费高清视频观看www99_欧美超逼视频_国产成人激情_dvd女人裸体 | 国产精品一区免费在线_欧美一级黄色毛片_一个人看的www高清免费视频_污污污污污污污网站污_正在播放亚洲一区_黄色一级生活片_日韩在线免费不卡_欧美福利在线 | 欧美日韩中文亚洲_国产有码在线_亚洲精品小视频在线观看_久久精品一级片_丰满人妻一区二区三区视频53_亚洲一区二区av在线_欧美一级片黄色_直接看的69xxx | 手机在线观看日韩av_天堂成人在线_国产91中文_欧美日韩国产精品一区二区三区四区_亚洲精品2_japanesemon乱_av无码天一区二区一三区_蜜臀成人av | 无码aⅴ一区二区三区_亚洲色欲色欲欲WWW在线_国产a国产片_一一高清视频在线观看_四虎影库久免费视频_人妻少妇精品视频专区_国产在线精品免费一区_国产视频综合网 | 特黄三级又爽又粗又大_国产精品99久久久久久一二区_成人看片人aa_综合成人_欧美激情一区三区_亚洲www在线观看_韩日在线观看视频_久久无码欧美一二三区 | 免费观看呢日本天堂视频_999久久国精品免费观看网站_少妇高潮a片无套内谢麻豆传_欧美在线一二_亚洲视频一级片_亚洲中文字幕无码超碰_各种高潮videos抽搐合集免费_麻豆出品必是精品 |